Providence Pipe Rehabilitation

PCCP water pipe strengthened with FRP composites.

Providence Pipe Rehabilitation

PCCP water pipe strengthened with FRP composites.

Providence Pipe Rehabilitation

PCCP water pipe strengthened with FRP composites.

Cathodic Protection Installation on Natural Draft Cooling Towers

In 2007, a condition survey and evaluation was performed on the exterior shell of two natural draft cooling towers owned by Progress Energy.

Cathodic Protection Installation on Natural Draft Cooling Towers

In 2007, a condition survey and evaluation was performed on the exterior shell of two natural draft cooling towers owned by Progress Energy.

Cathodic Protection Installation on Natural Draft Cooling Towers

In 2007, a condition survey and evaluation was performed on the exterior shell of two natural draft cooling towers owned by Progress Energy.

Pre-stressed Beam Repair at a Washington, DC Parking Structure

The parking structure of a government office building in Washington, D.C. suffered failure of two post-tensioned beams as a result of overloading.

Pre-stressed Beam Repair at a Washington, DC Parking Structure

The parking structure of a government office building in Washington, D.C. suffered failure of two post-tensioned beams as a result of overloading.

Pre-stressed Beam Repair at a Washington, DC Parking Structure

The parking structure of a government office building in Washington, D.C. suffered failure of two post-tensioned beams as a result of overloading.

Pre-stressed Beam Repair at a Washington, DC Parking Structure

The parking structure of a government office building in Washington, D.C. suffered failure of two post-tensioned beams as a result of overloading.

FRP Strengthening for Slab Penetrations

Several strengthening options were evaluated for this project, but the most effective proved to be the use of externally-bonded carbon fiber reinforced polymer (FRP) composites.

FRP Strengthening for Slab Penetrations

Several strengthening options were evaluated for this project, but the most effective proved to be the use of externally-bonded carbon fiber reinforced polymer (FRP) composites.

FRP Strengthening for Slab Penetrations

Several strengthening options were evaluated for this project, but the most effective proved to be the use of externally-bonded carbon fiber reinforced polymer (FRP) composites.

Frank Lloyd Wright's Fallingwater

Completed in 1939, Fallingwater is one of America’s most treasured landmarks. It is comprised of a series of concrete cantilever “trays” 30-feet above a waterfall.

Frank Lloyd Wright's Fallingwater

Completed in 1939, Fallingwater is one of America’s most treasured landmarks. It is comprised of a series of concrete cantilever “trays” 30-feet above a waterfall.

Frank Lloyd Wright's Fallingwater

Completed in 1939, Fallingwater is one of America’s most treasured landmarks. It is comprised of a series of concrete cantilever “trays” 30-feet above a waterfall.

Strengthening and Restoration of Casino

Innovative strategies maintain casino operations during contruction of concourse connecting new tower to casino.

Strengthening and Restoration of Casino

Innovative strategies maintain casino operations during contruction of concourse connecting new tower to casino.

Strengthening and Restoration of Casino

Innovative strategies maintain casino operations during contruction of concourse connecting new tower to casino.

Strengthening and Restoration of Casino

Innovative strategies maintain casino operations during contruction of concourse connecting new tower to casino.

Abu Dhabi Financial Centre

The new headquarters of the Abu Dhabi Financial Centre (ADFC) includes four high-rise office buildings comprising 285,000 square meters of dedicated office space. ADFC is part of Sowwah Square, a 570,000-square-meter office and retail space development.

Abu Dhabi Financial Centre

The new headquarters of the Abu Dhabi Financial Centre (ADFC) includes four high-rise office buildings comprising 285,000 square meters of dedicated office space. ADFC is part of Sowwah Square, a 570,000-square-meter office and retail space development.

Abu Dhabi Financial Centre

The new headquarters of the Abu Dhabi Financial Centre (ADFC) includes four high-rise office buildings comprising 285,000 square meters of dedicated office space. ADFC is part of Sowwah Square, a 570,000-square-meter office and retail space development.

Advanced Pit Within a Pit Liner Extends Service Life

A 1,400-square-foot sulfur pit at a North American refinery required immediate assessment after a partial roof collapse. Following a visual inspection by STRUCTURAL, a full repair was recommended. Because an unscheduled outage creates challenges, however, the owner opted to repair only the collapsed portion and delay the full repair for a scheduled outage.

Advanced Pit Within a Pit Liner Extends Service Life

A 1,400-square-foot sulfur pit at a North American refinery required immediate assessment after a partial roof collapse. Following a visual inspection by STRUCTURAL, a full repair was recommended. Because an unscheduled outage creates challenges, however, the owner opted to repair only the collapsed portion and delay the full repair for a scheduled outage.

Advanced Pit Within a Pit Liner Extends Service Life

A 1,400-square-foot sulfur pit at a North American refinery required immediate assessment after a partial roof collapse. Following a visual inspection by STRUCTURAL, a full repair was recommended. Because an unscheduled outage creates challenges, however, the owner opted to repair only the collapsed portion and delay the full repair for a scheduled outage.

Leon County Courthouse Parking Garage Strengthening

The Leon County Courthouse Parking Garage is a cast-in-place concrete structure with a capacity of more than 500 vehicles. It consists of five below-grade parking levels and a five-floor office structure above the parking levels. The garage also is home to a 135 ton memorial statue that sits on top of the courthouse's plaza deck which serves as the roof of the parking garage.

Leon County Courthouse Parking Garage Strengthening

The Leon County Courthouse Parking Garage is a cast-in-place concrete structure with a capacity of more than 500 vehicles. It consists of five below-grade parking levels and a five-floor office structure above the parking levels. The garage also is home to a 135 ton memorial statue that sits on top of the courthouse's plaza deck which serves as the roof of the parking garage.

Full Sulfur Pit Restoration

As a by-product of the hydrocarbon refining process, molten sulfurous compounds are generated, one of which is elemental sulfur.

Full Sulfur Pit Restoration

As a by-product of the hydrocarbon refining process, molten sulfurous compounds are generated, one of which is elemental sulfur.

Full Sulfur Pit Restoration

As a by-product of the hydrocarbon refining process, molten sulfurous compounds are generated, one of which is elemental sulfur.

Structural Strengthening using External Post-Tensioning Systems

The primary reasons for the strengthening of concrete structures are typically to increase existing elements’ capacity to carry new loads or to resolve an existing deficiency.

Structural Strengthening using External Post-Tensioning Systems

The primary reasons for the strengthening of concrete structures are typically to increase existing elements’ capacity to carry new loads or to resolve an existing deficiency.

FRP Utilized to Convert Parking Area to Conference Rooms for a West Coast Hotel

Parking area converted to conference space in a west coast hotel using externally bonded Fiber Reinforced Polymer (FRP) system.

FRP Utilized to Convert Parking Area to Conference Rooms for a West Coast Hotel

Parking area converted to conference space in a west coast hotel using externally bonded Fiber Reinforced Polymer (FRP) system.

FRP Utilized to Convert Parking Area to Conference Rooms for a West Coast Hotel

Parking area converted to conference space in a west coast hotel using externally bonded Fiber Reinforced Polymer (FRP) system.

Restoration of 18th Century Barn

Historic restoration of 18th Century barn that included the replacement of 75 percent of the wood floor structure and 100 percent of the wall framing and roof framing.

Restoration of 18th Century Barn

Historic restoration of 18th Century barn that included the replacement of 75 percent of the wood floor structure and 100 percent of the wall framing and roof framing.

Arena Raker Beam Strengthening

Strengthening solution helps keep new university arena construction on schedule.

Arena Raker Beam Strengthening

Strengthening solution helps keep new university arena construction on schedule.

Arena Raker Beam Strengthening

Strengthening solution helps keep new university arena construction on schedule.

Freedom Tower

Historic tower strengthened with FRP composites & concrete repair

Freedom Tower

Historic tower strengthened with FRP composites & concrete repair