Impressed Current Cathodic Protection Installation on Water Intake Structure

In 2010, owners of Calvert Cliffs Nuclear Power Plant in southern Maryland needed a solution for a corrosion problem in one of the large concrete intake structures which collects water from the Chesapeake Bay for cooling and processing within the plant.

Impressed Current Cathodic Protection Installation on Water Intake Structure

In 2010, owners of Calvert Cliffs Nuclear Power Plant in southern Maryland needed a solution for a corrosion problem in one of the large concrete intake structures which collects water from the Chesapeake Bay for cooling and processing within the plant.

Impressed Current Cathodic Protection Installation on Water Intake Structure

In 2010, owners of Calvert Cliffs Nuclear Power Plant in southern Maryland needed a solution for a corrosion problem in one of the large concrete intake structures which collects water from the Chesapeake Bay for cooling and processing within the plant.

Cathodic Protection Installation on Natural Draft Cooling Towers

In 2007, a condition survey and evaluation was performed on the exterior shell of two natural draft cooling towers owned by Progress Energy.

Cathodic Protection Installation on Natural Draft Cooling Towers

In 2007, a condition survey and evaluation was performed on the exterior shell of two natural draft cooling towers owned by Progress Energy.

Cathodic Protection Installation on Natural Draft Cooling Towers

In 2007, a condition survey and evaluation was performed on the exterior shell of two natural draft cooling towers owned by Progress Energy.

Hydrographers Pass- LifeJacket Installation on the Great Barrier Reef

A total of 19 10-meter long Lifejackets® were supplied as part of a rehabilitation effort on five lighthouse channel markers which guide safe travel through the Hydrographers Passage on the Great Barrier Reef. The passage is an area within the reef, located in the 1980’s, that provides safe deep water passage through the reef structure.

Hydrographers Pass- LifeJacket Installation on the Great Barrier Reef

A total of 19 10-meter long Lifejackets® were supplied as part of a rehabilitation effort on five lighthouse channel markers which guide safe travel through the Hydrographers Passage on the Great Barrier Reef. The passage is an area within the reef, located in the 1980’s, that provides safe deep water passage through the reef structure.

Pre-stressed Beam Repair at a Washington, DC Parking Structure

The parking structure of a government office building in Washington, D.C. suffered failure of two post-tensioned beams as a result of overloading.

Pre-stressed Beam Repair at a Washington, DC Parking Structure

The parking structure of a government office building in Washington, D.C. suffered failure of two post-tensioned beams as a result of overloading.

Pre-stressed Beam Repair at a Washington, DC Parking Structure

The parking structure of a government office building in Washington, D.C. suffered failure of two post-tensioned beams as a result of overloading.

FRP Strengthening for Slab Penetrations

Several strengthening options were evaluated for this project, but the most effective proved to be the use of externally-bonded carbon fiber reinforced polymer (FRP) composites.

FRP Strengthening for Slab Penetrations

Several strengthening options were evaluated for this project, but the most effective proved to be the use of externally-bonded carbon fiber reinforced polymer (FRP) composites.

FRP Strengthening for Slab Penetrations

Several strengthening options were evaluated for this project, but the most effective proved to be the use of externally-bonded carbon fiber reinforced polymer (FRP) composites.

Frank Lloyd Wright's Fallingwater

Completed in 1939, Fallingwater is one of America’s most treasured landmarks. It is comprised of a series of concrete cantilever “trays” 30-feet above a waterfall.

Frank Lloyd Wright's Fallingwater

Completed in 1939, Fallingwater is one of America’s most treasured landmarks. It is comprised of a series of concrete cantilever “trays” 30-feet above a waterfall.

Frank Lloyd Wright's Fallingwater

Completed in 1939, Fallingwater is one of America’s most treasured landmarks. It is comprised of a series of concrete cantilever “trays” 30-feet above a waterfall.

Strengthening and Restoration of Casino

Of utmost importance to the Owner – connecting these two buildings to give guests full access to the revenue generating casino.

Strengthening and Restoration of Casino

Of utmost importance to the Owner – connecting these two buildings to give guests full access to the revenue generating casino.

Strengthening and Restoration of Casino

Of utmost importance to the Owner – connecting these two buildings to give guests full access to the revenue generating casino.

Abu Dhabi Financial Centre

The new headquarters of the Abu Dhabi Financial Centre (ADFC) includes four high-rise office buildings comprising 285,000 square meters of dedicated office space. ADFC is part of Sowwah Square, a 570,000-square-meter office and retail space development.

Abu Dhabi Financial Centre

The new headquarters of the Abu Dhabi Financial Centre (ADFC) includes four high-rise office buildings comprising 285,000 square meters of dedicated office space. ADFC is part of Sowwah Square, a 570,000-square-meter office and retail space development.

Abu Dhabi Financial Centre

The new headquarters of the Abu Dhabi Financial Centre (ADFC) includes four high-rise office buildings comprising 285,000 square meters of dedicated office space. ADFC is part of Sowwah Square, a 570,000-square-meter office and retail space development.

Advanced Pit Within a Pit Liner Extends Service Life

A 1,400-square-foot sulfur pit at a North American refinery required immediate assessment after a partial roof collapse. Following a visual inspection by STRUCTURAL, a full repair was recommended. Because an unscheduled outage creates challenges, however, the owner opted to repair only the collapsed portion and delay the full repair for a scheduled outage.

Advanced Pit Within a Pit Liner Extends Service Life

A 1,400-square-foot sulfur pit at a North American refinery required immediate assessment after a partial roof collapse. Following a visual inspection by STRUCTURAL, a full repair was recommended. Because an unscheduled outage creates challenges, however, the owner opted to repair only the collapsed portion and delay the full repair for a scheduled outage.

Advanced Pit Within a Pit Liner Extends Service Life

A 1,400-square-foot sulfur pit at a North American refinery required immediate assessment after a partial roof collapse. Following a visual inspection by STRUCTURAL, a full repair was recommended. Because an unscheduled outage creates challenges, however, the owner opted to repair only the collapsed portion and delay the full repair for a scheduled outage.

Pit within a Pit

A major refining company in Texas had a subsurface reinforced concrete sulfur pit that began to experience degradation when water started to enter the pit through cracks in the concrete walls.

Pit within a Pit

A major refining company in Texas had a subsurface reinforced concrete sulfur pit that began to experience degradation when water started to enter the pit through cracks in the concrete walls.

Pit within a Pit

A major refining company in Texas had a subsurface reinforced concrete sulfur pit that began to experience degradation when water started to enter the pit through cracks in the concrete walls.

DAR - Constitution Hall and Memorial Continental Hall

On the exterior of the buildings, material deterioration, delamination, fractured and loose elements, material staining, improper patching, as well as ponding water and drainage issues were all found to be issues of concern.

DAR - Constitution Hall and Memorial Continental Hall

On the exterior of the buildings, material deterioration, delamination, fractured and loose elements, material staining, improper patching, as well as ponding water and drainage issues were all found to be issues of concern.

The New York Hall of Science Great Hall

Recent investigations revealed concrete spalling and deterioration, due mainly to inadequate rebar coverage, at various locations. The pre-cast panels were cracking between the pieces of glass and the edges of the panel and the surface sand finish was washing away.

The New York Hall of Science Great Hall

Recent investigations revealed concrete spalling and deterioration, due mainly to inadequate rebar coverage, at various locations. The pre-cast panels were cracking between the pieces of glass and the edges of the panel and the surface sand finish was washing away.

The New York Hall of Science Great Hall

Recent investigations revealed concrete spalling and deterioration, due mainly to inadequate rebar coverage, at various locations. The pre-cast panels were cracking between the pieces of glass and the edges of the panel and the surface sand finish was washing away.

New Marlins Stadium

Working with the engineering and construction team, it was decided that the support beams for the retractable roof would be constructed on the ground and lifted into place using VSL heavy lifting equipment.

New Marlins Stadium

Working with the engineering and construction team, it was decided that the support beams for the retractable roof would be constructed on the ground and lifted into place using VSL heavy lifting equipment.

New Marlins Stadium

Working with the engineering and construction team, it was decided that the support beams for the retractable roof would be constructed on the ground and lifted into place using VSL heavy lifting equipment.

Vanderbilt University

In effort to enlarge its medical research facilities, Vanderbilt University performed a vertical expansion of its existing laboratory building and construction of a new connected tower that was built over the existing Langford Auditorium.

Vanderbilt University

In effort to enlarge its medical research facilities, Vanderbilt University performed a vertical expansion of its existing laboratory building and construction of a new connected tower that was built over the existing Langford Auditorium.

Vanderbilt University

In effort to enlarge its medical research facilities, Vanderbilt University performed a vertical expansion of its existing laboratory building and construction of a new connected tower that was built over the existing Langford Auditorium.

Unique Strategy Keeps Concrete Dock Operational During Repairs

A Southern refinery for a major oil and gas company had a concrete dock built in 1910 that needed significant repairs. The 3,000-foot-long dock is connected to an intercoastal waterway and serves as the off-load point for crude oil and the on-load point for petroleum products with ships arriving and departing daily.

Unique Strategy Keeps Concrete Dock Operational During Repairs

A Southern refinery for a major oil and gas company had a concrete dock built in 1910 that needed significant repairs. The 3,000-foot-long dock is connected to an intercoastal waterway and serves as the off-load point for crude oil and the on-load point for petroleum products with ships arriving and departing daily.

Unique Strategy Keeps Concrete Dock Operational During Repairs

A Southern refinery for a major oil and gas company had a concrete dock built in 1910 that needed significant repairs. The 3,000-foot-long dock is connected to an intercoastal waterway and serves as the off-load point for crude oil and the on-load point for petroleum products with ships arriving and departing daily.

STRUCTURAL Delivers a Successful Turnaround

STRUCTURAL was contacted by a major refinery in Texas to perform work to their Delayed Coking Unit (DCU) and Sulfur Recovery Unit (SRU) structures during a scheduled shutdown. More than eight offices provided project management and field labor to complete the work.

STRUCTURAL Delivers a Successful Turnaround

STRUCTURAL was contacted by a major refinery in Texas to perform work to their Delayed Coking Unit (DCU) and Sulfur Recovery Unit (SRU) structures during a scheduled shutdown. More than eight offices provided project management and field labor to complete the work.

STRUCTURAL Delivers a Successful Turnaround

STRUCTURAL was contacted by a major refinery in Texas to perform work to their Delayed Coking Unit (DCU) and Sulfur Recovery Unit (SRU) structures during a scheduled shutdown. More than eight offices provided project management and field labor to complete the work.

Cathodic Protection of Historic Terra Cotta Cornice

Constructed in 1904, this building houses the administrative functions of a major historic museum in Washington, D.C. Located along the Mall, the facility is a National Historic Landmark and an important destination for many.

Cathodic Protection of Historic Terra Cotta Cornice

Constructed in 1904, this building houses the administrative functions of a major historic museum in Washington, D.C. Located along the Mall, the facility is a National Historic Landmark and an important destination for many.

Cathodic Protection of Historic Terra Cotta Cornice

Constructed in 1904, this building houses the administrative functions of a major historic museum in Washington, D.C. Located along the Mall, the facility is a National Historic Landmark and an important destination for many.

Utah State Capitol Base Isolation and Restoration

The State of Utah undertook a complete historic preservation and base isolation retrofit to their historic capitol. To protect the massive, yet ornate building in an earthquake, the building was strengthened using 256 state-of-the-art seismic isolators placed under the building.

Utah State Capitol Base Isolation and Restoration

The State of Utah undertook a complete historic preservation and base isolation retrofit to their historic capitol. To protect the massive, yet ornate building in an earthquake, the building was strengthened using 256 state-of-the-art seismic isolators placed under the building.

Belleair Beach Causeway Bridge

The new Belleair Beach Causeway Bridge in Belleair Beach, Florida was constructed to replace the existing bascule bridge spanning the Gulf Intracoastal Waterway. Included in the design for the new 3350-foot bridge were 75-foot long approach spans.

Belleair Beach Causeway Bridge

The new Belleair Beach Causeway Bridge in Belleair Beach, Florida was constructed to replace the existing bascule bridge spanning the Gulf Intracoastal Waterway. Included in the design for the new 3350-foot bridge were 75-foot long approach spans.

The North Arm Bridge

The North Arm Bridge over the Frasier River in Vancouver, BC is a signature span cable stayed bridge built using precast segmental box girder construction. It has back spans of 456 feet and a main span of 590 feet - high enough to allow for marine traffic to pass below without obstruction. It is also the first extradosed bridge in North America.

The North Arm Bridge

The North Arm Bridge over the Frasier River in Vancouver, BC is a signature span cable stayed bridge built using precast segmental box girder construction. It has back spans of 456 feet and a main span of 590 feet - high enough to allow for marine traffic to pass below without obstruction. It is also the first extradosed bridge in North America.

Chesapeake Bay Bridge Tunnel Repair

The Chesapeake Bay Bridge-Tunnel (CBBT), originally open to traffic in 1964, is one of the most significant transportation structures in North America. Built and operated by the Chesapeake Bay Bridge and Tunnel District, CBBT is the world’s largest bridge-tunnel complex.

Chesapeake Bay Bridge Tunnel Repair

The Chesapeake Bay Bridge-Tunnel (CBBT), originally open to traffic in 1964, is one of the most significant transportation structures in North America. Built and operated by the Chesapeake Bay Bridge and Tunnel District, CBBT is the world’s largest bridge-tunnel complex.

Margaret Hunt Hill Bridge - The Trinity River Project

As part of the Trinity River Project in Dallas, Texas, the Margaret Hunt Hill Bridge is a signature span designed by architect Santiago Calatrava in conjunction with Huitt-Zollars.

Margaret Hunt Hill Bridge - The Trinity River Project

As part of the Trinity River Project in Dallas, Texas, the Margaret Hunt Hill Bridge is a signature span designed by architect Santiago Calatrava in conjunction with Huitt-Zollars.

Calvert Cliffs Nuclear Power Plant

In March 2000, Calvert Cliffs Nuclear Power Plant (CCNPP), built by Baltimore Gas & Electric in the 1970s, became the first plant in the United States to earn 20-year extensions of its operating licenses from the U.S. Nuclear Regulatory Commission.

Calvert Cliffs Nuclear Power Plant

In March 2000, Calvert Cliffs Nuclear Power Plant (CCNPP), built by Baltimore Gas & Electric in the 1970s, became the first plant in the United States to earn 20-year extensions of its operating licenses from the U.S. Nuclear Regulatory Commission.

Calvert Cliffs Nuclear Power Plant

In March 2000, Calvert Cliffs Nuclear Power Plant (CCNPP), built by Baltimore Gas & Electric in the 1970s, became the first plant in the United States to earn 20-year extensions of its operating licenses from the U.S. Nuclear Regulatory Commission.

Galvanic Protection LifeJacket Installation in Remote Alaska

In Ketchikan, Alaska, much of the area’s income is derived from tourism, as well as vessel repair and manufacturing. Two viaducts, supporting approximately 17, 000 vehicles a day, help ensure a strong economy. Keeping them safe and well-maintained is essential

Galvanic Protection LifeJacket Installation in Remote Alaska

In Ketchikan, Alaska, much of the area’s income is derived from tourism, as well as vessel repair and manufacturing. Two viaducts, supporting approximately 17, 000 vehicles a day, help ensure a strong economy. Keeping them safe and well-maintained is essential

Renovating Resorts Atlantic City

The adage “time is money” is certainly relevant to many industries as it relates to building renovations and the cost of downtime, interruptions to services or inconveniences to customers.

Renovating Resorts Atlantic City

The adage “time is money” is certainly relevant to many industries as it relates to building renovations and the cost of downtime, interruptions to services or inconveniences to customers.

Electro-Chemical Dewatering System

For building owners and managers, one of the biggest issues is a damp or moldy basement area resulting from water intrusion through cracked concrete slabs and foundation walls. This is evidenced by the fact that structural engineers are often asked by architects and building owners about the cost to design crack-free concrete structures.

Electro-Chemical Dewatering System

For building owners and managers, one of the biggest issues is a damp or moldy basement area resulting from water intrusion through cracked concrete slabs and foundation walls. This is evidenced by the fact that structural engineers are often asked by architects and building owners about the cost to design crack-free concrete structures.

Anchored in the Real World

By definition, anchor bolts are typically a headed or threaded metal bolt or stud that is cast-in-place, grouted-in-place, or drilled into finished concrete. They are used to hold various structural members or embedments in the concrete and are able to resist shear, tension and vibration loading.

Anchored in the Real World

By definition, anchor bolts are typically a headed or threaded metal bolt or stud that is cast-in-place, grouted-in-place, or drilled into finished concrete. They are used to hold various structural members or embedments in the concrete and are able to resist shear, tension and vibration loading.

Full Sulfur Pit Restoration

As a by-product of the hydrocarbon refining process, molten sulfurous compounds are generated, one of which is elemental sulfur.

Full Sulfur Pit Restoration

As a by-product of the hydrocarbon refining process, molten sulfurous compounds are generated, one of which is elemental sulfur.

Full Sulfur Pit Restoration

As a by-product of the hydrocarbon refining process, molten sulfurous compounds are generated, one of which is elemental sulfur.

Structural Strengthening using External Post-Tensioning Systems

The primary reasons for the strengthening of concrete structures are typically to increase existing elements’ capacity to carry new loads or to resolve an existing deficiency.

Structural Strengthening using External Post-Tensioning Systems

The primary reasons for the strengthening of concrete structures are typically to increase existing elements’ capacity to carry new loads or to resolve an existing deficiency.