Industrial Case Studies
Advanced Pit Within a Pit Liner Extends Service Life
A 1,400-square-foot sulfur pit at a North American refinery required immediate assessment after a partial roof collapse. Following a visual inspection by STRUCTURAL, a full repair was recommended. Because an unscheduled outage creates challenges, however, the owner opted to repair only the collapsed portion and delay the full repair for a scheduled outage. ... Read more
Full Sulfur Pit Restoration
As a by-product of the hydrocarbon refining process, molten sulfurous compounds are generated, one of which is elemental sulfur.... Read more
Pit within a Pit
A major refining company in Texas had a subsurface reinforced concrete sulfur pit that began to experience degradation when water started to enter the pit through cracks in the concrete walls. ... Read more
Unique Strategy Keeps Concrete Dock Operational During Repairs
A Southern refinery for a major oil and gas company had a concrete dock built in 1910 that needed significant repairs. The 3,000-foot-long dock is connected to an intercoastal waterway and serves as the off-load point for crude oil and the on-load point for petroleum products with ships arriving and departing daily. ... Read more
Copyright 2012 Structural Group, Inc