A North American refinery had 2 underperforming cooling tower supply lines due to deterioration. The pipes (36” in diameter and 300 ft. long) had thinning walls, breaches, leaking water and severe steel pipe pitting. Not scheduled for an outage for another 3-5 years, the refinery needed a repair.
STRUCTURAL developed a solution for the client that allowed the work to be performed while the cooling tower was operational.
Project Overview
A North American refinery had 2 underperforming cooling tower supply lines due to deterioration. The pipes (36” in diameter and 300 ft. long) had thinning walls, breaches, leaking water and severe steel pipe pitting. Not scheduled for an outage for another 3-5 years, the refinery needed a repair.
STRUCTURAL developed a solution for the client that allowed the work to be performed while the cooling tower was operational. The high-strength fiberglass composite system featured a factory‑impregnated moisture-cured urethane (MCU) resin system that is moisture-activated by water and cures rapidly. Prior to installation, the pitted areas were resurfaced with an epoxy grout to ensure proper bond.
The solution performed for over eight years when the piping was replaced in a scheduled turnaround.
PROJECT INFO
- Location: United States
- Contractor: STRUCTURAL
SOLUTIONS
MARKET
Related Projects
Contact Us
Ready to take the next step? Reach out to our team today and let’s work together on solutions to your infrastructure challenges.






