A below grade vault had major water intrusion causing high levels of deterioration. There were approximately 6” – 8” of standing water with the main source being pipe sleeve penetrations.

STRUCTURAL was hired to perform the repairs. Bringing on their engineering and design partner, STRUCTURAL TECHNOLOGIES, the team proposed a leakage mitigation plan.

Project Overview

  • 6” – 8” standing water in basement causing deterioration
  • STRUCTURAL TECHNOLOGIES helped design a leakage mitigation plant
  • Grout injection implemented in pipe sleeves
  • Perimeter curbing and sumps for water control

A below grade vault had major water intrusion causing high levels of deterioration. There were approximately 6” – 8” of standing water with the main source being pipe sleeve penetrations.

STRUCTURAL was hired to perform the repairs. Bringing on their engineering and design partner, STRUCTURAL TECHNOLOGIES, the team proposed a leakage mitigation plan. STRUCTURAL performed grout injection at all problematic pipe sleeves to prevent future leaking. The team also installed a concrete curb and a sump pump to create a perimeter trench.

The repairs significantly reduced the water intrusion and created an adequate control system.

PROJECT INFO

  • Specialty Contractor: STRUCTURAL
  • Design & Engineering: STRUCTURAL TECHNOLOGIES

SOLUTIONS

MARKET

Related Projects

Contact Us

Ready to take the next step? Reach out to our team today and let’s work together on solutions to your infrastructure challenges.

Scroll to top