A parking structure showed signs of leaks and cracks due to the age of its coating and improper drain maintenance.
Originally a coating repair project was scheduled to take place over a 10-day period. Due to the high foot traffic of the structure, the client wanted to prioritize minimizing disturbances to its patrons.
Project Overview
A parking structure showed signs of leaks and cracks due to the age of its coating and improper drain maintenance.
Originally a coating repair project was scheduled to take place over a 10-day period. Due to the high foot traffic of the structure, the client wanted to prioritize minimizing disturbances to its patrons.
STRUCTURAL used their expertise to develop a three-day, fast-track repair that would also provide a 10-year warranty. By creating an alternative project schedule, STRUCTURAL completed the project during the weekend, minimizing the structure’s downtime during peak times.
Repairs consisted of removing the existing waterproof membrane and installing a new cove sealant with urethane caulk at the vertical to horizontal intersections. STRUCTURAL’s experience helped the client save time, money, and minimize downtime.
PROJECT INFO
- Location: New York, NY
- Specialty Contractor: STRUCTURAL
- Owner: East 67th Street Garage
SOLUTIONS
MARKET
Related Projects
Contact Us
Ready to take the next step? Reach out to our team today and let’s work together on solutions to your infrastructure challenges.